Services
Digital Strategy
Digitalization in a construction project doesn't succeed through software alone. It succeeds through a clear strategy. TriPoint supports planning teams, owners, and operators in making the right decisions before the first model is even created: what information is needed, which processes need to work, and whether the organization is ready to go down this path. The following four building blocks can be commissioned individually or in any combination, depending on what your project actually needs.
BIM Strategy
We help you define what contribution BIM should make in your company or your project. We clarify goals, scope, and framework conditions, and develop an actionable plan that fits your organization. No theoretical construct, no off-the-shelf solution. This service can be booked individually.
Process Design
Well-planned processes determine whether a project runs smoothly or needs constant correction. We help planning teams, owners, and operators structure their planning processes: clear workflows, defined interfaces, realistic milestones. We work closely with everyone involved, because a process that stakeholders don't help shape won't be followed either. The result isn't a manual that ends up on a shelf, but an agreed way of working that functions in everyday project life. This service can be booked individually.
BIM Due Diligence
Want to know whether a planning team, a contractor, or your own organization is truly ready to deliver a BIM project successfully? We analyze organizational structure, roles, skill levels, and the system landscape, and identify the risks that could jeopardize a project before they do. This service can be booked individually.
BIM at Handover and in Operations
Building data is only valuable if it's usable in operations. We help you define the requirements for data handover early on, in close collaboration with the planning team, owners, and operators. The result is a jointly developed solution that ensures your facility management can work with a data foundation that delivers on its promise. This service can be booked individually.
BIM Management
An investment in a construction project is one of the most significant decisions a client makes. BIM management ensures this investment is professionally guided from start to finish, with clear information requirements, traceable quality assurance, and transparent communication. TriPoint represents your interests as the client and makes sure the project runs the way you decided it should. At TriPoint, BIM management is commissioned as a complete package: all the following building blocks are included and work together.
Strategic Project Initiation
The foundation for a successful construction project isn’t laid on the construction site, it’s laid in preparation. We help you set up the project digitally the right way: defining goals, staking out scope, asking the right questions before contracts are signed. A structured initiation protects your investment by preventing later misunderstandings and extra costs.
Information Requirements (EIR / AIR)
What information should the project deliver, and when? We formulate your Employer's Information Requirements (EIR) precisely and completely, so that everyone involved in planning is bound to the same basis. If you also operate your building yourself, we additionally develop the Asset Information Requirements (AIR), so that the handover to operations doesn't have to be reinvented at the end of the project but is considered from the start.
Quality Assurance and Performance Control
Design and planning deliverables need to be not just provided, but measurable. We review the delivered building models for completeness and conformity with the agreed requirements from the client's perspective. Deviations are documented, assessed, and communicated in a targeted way. That gives you a clear picture of project progress at all times and a solid basis for your decisions.
Quality Checking to the IDS Standard
The Information Delivery Specification (IDS) is an internationally recognized, machine-readable standard that precisely defines what information a building model must contain, in what format, with which attributes, and in what structure. Developed by buildingSMART International, IDS replaces vague text descriptions with unambiguous, automatically checkable rules.
For the client, that's a fundamental advantage: the information requirements aren't just written down, they're built into the contract with the contractors as a binding basis. What's required becomes objectively measurable, and what's delivered can be checked automatically against these rules. Room for interpretation disappears, resubmissions are reduced, and you get transparent proof of the digital deliverables actually provided.
CDE Setup and Administration
A Common Data Environment (CDE) is the project's digital infrastructure, the central place where all information is stored, approved, and tracked in a structured way. We set up your CDE, define access rights and workflows, and administer it throughout the entire project. That way, as the client, you stay in control of your project data at all times.
BIM Coordination
More and more clients are requiring BIM, but what that means in concrete terms often stays unclear. Models get created, requirements exist on paper, but nobody has defined: who delivers what? When is it needed? In what form does it need to arrive? And who's responsible for it?
This is exactly where BIM coordination begins. For TriPoint, BIM isn't just about declaring information, it's about thinking through the process in depth: Who delivers, What needs to be delivered, How it should be structured, and When it needs to be available. This 4W principle is the foundation of our coordination work, and the difference between a BIM project that actually functions and one that only does so on paper.
At TriPoint, BIM coordination is likewise commissioned as a complete package. All the following building blocks are included and build on each other.
Coordination Strategy and Project Setup
Before coordination can happen, the framework has to be right. We define the coordination processes, translate the client's requirements into the planning team's language, and develop an agile planning strategy tuned to the project's dynamics. Roles, interfaces, and delivery dates are fixed in a binding way, so everyone involved knows what's expected of them from the start.
Coordination of Discipline Models
Every discipline delivers its own model. Only once they come together does it become clear whether everything works. We coordinate the discipline models of everyone involved, check geometry and information for consistency, and identify conflicts. Coordination happens on the basis of open data formats to the IFC standard, vendor-neutral and traceable for everyone involved.
Clash Detection and Conflict Management
Clashes between components from different trades are one of the most common cost drivers in construction projects. We carry out structured clash detection, document the findings, and support their resolution within the coordination process, with clear assignment of responsibilities and tracking through to resolution.
Issue Management
Open items, conflicts, and points needing clarification need a structured platform so they don't get lost in email threads. We provide an issue management platform, set it up specifically for the project, and administer it throughout the entire project. Every issue is logged, assigned, and tracked through to resolution, transparently for everyone involved.
IDS Validation Rules
If the client doesn’t provide machine-readable validation rules to the IDS standard, we develop them ourselves based on the existing requirements. IDS rules define precisely what information a model must contain and enable automated, traceable quality checks throughout the entire project.
Coordination Meetings, Reporting, and Handover
Coordination needs communication. We prepare coordination meetings, chair them, and make sure decisions are documented and implemented. Progress is regularly summarized in structured reports. The process concludes with the coordinated handover of the models, as a solid foundation for detailed design or operations.
Modeling
Not every planning team has the capacity or specialization to create BIM models in the required quality and structure. TriPoint provides access to experienced, vetted modeling partners and takes on the technical coordination, from defining requirements through to sign-off on the results. Quality assurance is an integral part of every service.
Modeling for a Specific Task
Sometimes a model is needed for a clearly defined purpose: a permit submission, a coordination model for a particular design stage, or a partial model for a specific discipline. We define together with you what the model needs to achieve, arrange the right modeling service, and check the result against the agreed information requirements before it’s handed over.
Ongoing Modeling Support
For ongoing projects that need continuous modeling support, we coordinate the collaboration between the planning team and the modeling partner throughout the entire project. We create, coordinate, and deliver the models directly to the contractors. We align delivery dates, levels of detail, and format requirements, and use ongoing quality checks to make sure the models meet current requirements at every point in time.
FAQs
What's the difference between a project strategy and a company-wide BIM strategy?
A project strategy applies only to a specific construction project. A company-wide strategy covers standards, software, and capability building beyond individual projects. TriPoint often develops a project strategy first and derives the company-wide direction from it.
From what project size does a dedicated BIM execution strategy make sense?
What matters is less the size than the complexity: the number of specialist planners, project phases, and whether the data will later be used in operations. A single-family home rarely needs its own strategy; a multi-story commercial building almost always does.
Does TriPoint work with IDS (Information Delivery Specification) on projects?
Yes, IDS is at the core of TriPoint's company strategy. Even when the client doesn't provide IDS files themselves, they're created anyway. This creates clarity within the team setup, makes requirements traceable for everyone involved, and also provides a solid basis for benchmarking.
How does consulting for BIM beginners differ from consulting for experienced companies?
For beginners, the focus is on building a basic understanding and running a manageable pilot project. For experienced companies, it’s usually about targeting specific weak points, such as inefficient handovers between trades.
A project in LP2 (preliminary design) isn't going well in the BIM process. Is there still a chance to save it?
Yes, a restart is possible even mid-project. TriPoint has successfully supported this before: the existing status is analyzed, information requirements and processes are set up clearly after the fact, and the project is put back on solid footing, instead of losing the work already invested.
What are the advantages for a planner in outsourcing BIM overall coordination?
The planner can focus on their actual design work instead of carrying the extra burden of coordination between trades. External overall coordination also brings a neutral perspective that assesses conflicts objectively, without representing the interests of any single specialist planner. The effort involved in overall coordination shouldn't be underestimated: this role is often handed to a project manager on top of their existing duties, which quickly leads to overload, since project management and overall coordination both demand full attention.
Up to which project phase is BIM overall coordination needed?
That depends on the project, but overall coordination is usually especially relevant until the end of detailed design or completion, since that's where most interface conflicts arise. For projects with a data handover into operations, it can also be usefully continued through commissioning.
What influence does BIM management have on contracts between clients and planners?
It provides the technical basis for the EIR, which become part of the planners' contracts, for example around delivery dates and responsibility for model quality. Without this alignment, BIM services in contracts often remain only superficially mentioned.
Can BIM management still be brought in usefully after design work has already begun?
An early start is ideal. A later start is possible too: in that case, the existing status is analyzed and the contractual basis is supplemented after the fact.
When does external modeling make more sense than handling it in-house?
Especially during capacity peaks, for special requirements, or when software or methodology expertise is missing in-house. TriPoint helps assess which option is more economical.
What file format does the client receive, and is it compatible with their own software?
The target format, native format or open IFC, is defined in advance and depends on the client's software. That keeps the models reliably usable going forward.
What level of accuracy is realistic for an as-built survey intended for operations?
That depends on the intended use: less accuracy is often sufficient for area documentation, while building services need higher accuracy. TriPoint defines this in advance together with the operator.
How is it decided which areas of an existing building get surveyed?
The intended use sets the priority, for example maintenance or renovation planning. That way, relevant areas are captured in a targeted way instead of surveying the whole building indiscriminately.
How is the data made usable for facility management?
By linking the captured geometry with relevant attributes such as maintenance intervals or component information. Only that makes the model usable for facility management.
Scan-to-BIM
Anyone who wants to plan, renovate, or extend an existing building needs one thing first: a reliable foundation. Old drawings often don't match the actual condition, and assumptions cost money in a construction project. Scan-to-BIM captures the real condition of a building to the millimeter and turns it into a digital building model that can be used as a planning basis, for analysis, or for facility management. TriPoint coordinates this process from the scan capture through to the finished, structured BIM model. We define the requirements for the scan and the model together with you where needed, though they can also already be specified by the client. Either way, TriPoint takes care of professional implementation.
Point Cloud Capture
The building or area is captured three-dimensionally using laser scanning. The result is a highly precise point cloud, a digital image of the real condition. We coordinate the capture through experienced scanning partners, define the required level of detail, and make sure the data is complete and at the quality needed for further processing.
Modeling from the Point Cloud
A structured BIM model is created from the point cloud, containing the information needed for the specific purpose. Whether it's for renovation planning, building documentation, or handover to facility management: we define the modeling scope and the information requirements, coordinate the modeling service, and check the result for completeness and conformity.
As-Built Documentation for Operations
Scan-to-BIM doesn't end with the model. For operators and property owners, structured as-built documentation provides the foundation for predictive maintenance, efficient facility management, and sound decisions on future renovation projects. We make sure the model isn't just geometrically accurate, but also contains the information that's actually needed in operations.
Which service fits your project?
In a short conversation, we'll work out where TriPoint can make the biggest difference.
